Location: 

Kansas City, KS

Details: 

This project consisted of the installation of a new Caterpillar 500kw Diesel Generator Set to provide emergency power to the Robert J. Dole Federal Building. The existing retaining wall was demoed and reconfigured to accommodate a twelve inch thick concrete slab and generator set. In the electrical equipment room, the existing transformer was replaced with a more energy efficient transformer. A new ASCO Automatic Transfer Switch was installed to transfer power depending on available sources. New electrical panels and transient voltage suppression devices were installed on all seven floors.

Displayed Associated Experience