Rand has performed a number of projects for Independence Power & Light at both the Blue Valley Station and the Missouri City Station. Details of the various projects follow:
- Turbine Induction Upgrades (Blue Valley Station): Performed repairs and modifications to the turbine water induction prevention system.
- Tube Replacement - Units 1 & 2 (Blue Valley Station): Replaced boiler tubes on two (2) units at the municipal power plant.
- Control Room Renovation (Blue Valley Station): Renovated power station control room and HVAC systems.
- Emergency Restoration (Blue Valley Station): Repaired emergency weld.
- Boiler Upgrades & Re-tube (Blue Valley Station): Replaced roof tubes and associated expansion joints.
- Boiler Corner Re-tube - Unit 1 (Blue Valley Station): Upgraded all four (4) burner assemblies, associated parts and piping.
- Boiler Upgrades - Unit 2 (Missouri City Station): Installed pressure part assemblies and repaired tubes.
- Boiler Re-tube - Units 1 & 2 (Missouri City Station): Removed and replaced roof, arch, and pendant tubes.
- Traveling Screen Replacement (Missouri City Station): Removed existing traveling screen and installed four (4) new screens for the intake structure.