This project consisted of a new 3-story medical office building at Shawnee Mission Medical Center. Rand was hired as the design-build mechanical and plumbing contractor for the tenants. The new medical office building core and shell is served by three McQuay packaged rooftop units and a fan-powered box/ VAV system. Rand also installed men and women gang restrooms on each floor, as well as primary and secondary storm drainage systems, along with “wet columns” for future tenants to tie into valved/ capped water, waste, and vent lines so as to not disturb the operations of the building.